09 Apr 2014

New Tesco Store Update

0 Comment

SDM Fabrication Limited have undertaken the design of connections, fabrication and detail drawing of steelwork required for a new Tesco Store at Chatteris on behalf of Main Contractor RG Carter Projects Limited, a key feature of this new store is a 38 metre truss which will support much of the stores new roof structure, at 3.2 metres deep and weighing in at 18000 Kg’s it’s installation made for an impressive photo opportunity.

[top]